Centered around Amos Ponds as part of the Townline Provincially Significant Wetland (PSW) located adjacent to Rouge National Urban Park (RNUP) a turtle conservation plan has been ongoing for over a decade. Partners are many and are primarily comprised of the City of Pickering, Eco-Kare International, Parks Canada, and the Toronto Zoo. Freshwater turtles are all Species at risk in Canada and road mortality and habitat loss are primary threats. Our team, focused on providing animals with safe wildlife crossings where previous monitoring has shown that amphibians, turtles, snakes, and small mammals are often road-killed where the roads bisect these wetlands.
The project has been completed in several construction-monitoring stages over the past ten years. most recently the City of Pickering finished a road upgrade project on the Townline. This upgrade project featured three new upsized culverts at 750 mm where the road bisects the wetland. Collectively, one box culvert, three metal elliptical culverts, two open-top tunnels, several large wildlife billboard signs, and up to 1200 m of opaque fence to funnel animals to safe crossings will be installed by 2027. Previous monitoring has shown turtles will use the under road tunnels reducing risk of car collision.